After primary crushing, the uranium ore is reduced to 20cm in diameter, then the crushed ore will be conveyed to the coarse crushing machine for further crushing.
The crushed uranium passed through a further three crushing stages, further reducing its size to the consistency of fine sand. The final size will be down to 2mm, then the screening plant will sieve and separate the crushed uranium ore to the demand size. After weighing, the uranium ore will be stored on a stockpile for grinding.
Large scale stationary uranium ore crushing plant is available for the clients.
Construction of the uranium ore concentration plant, and in particular, of the design and construction of the grinding process line is the key for uranium recovery.
Wet grinding plant in in-situ leach plant is used to grind the crushed ore grains by means of steel ball mill for reducing the uranium ore fine enough with the consistency of mud. The Ball mill, Coarse Powder Mill is utilised as required by production levels and operate in parallel.
The high capacity ball mill manufactured by Zenith Machinery grinding the uranium ore in a rotating cylinder using large pieces of the ore instead of conventional steel balls or rods. The grinding mill features low consumption, easy operation and so on.